crazy legs: the blog

Saturday, September 18, 2004

Nursery Update

True to form, we still do not have the baby's room ready for little Crazy Legs just yet. BUT, we are making progress. There has been a dramatic color scheme change in our second bedroom / office as evidenced by the following before and after photos. It was only after much spackle, two coats of primer, three coats of Capri Cream and a little bit of swearing that we went from this...




to this...




We've also got the bassinet all ready to go in our room so that Crazy Legs will be within arm's reach for the first few weeks after we bring him/her home from the hosptial. Frankie has only tried to jump into it once. That's not bad considering his tendency to continually stick his nose into everything.

Otherwise, we have a few "Safety Stop" issues to address (securing the cords on the blinds, replacing the death-trap halogen floor lamp, etc.) and some further cutesy decorating that we want to do (crown molding, wall hangings, etc.) before we bring CL home. I mean, we have 6 weeks, right? That's plenty of time.

0 Comments:

Post a Comment

<< Home